Datum der Veröffentlichung
              Code
I-
      
            23
      
  Dokumentensprache
              English
          Bild
               
  Download
              
 Rapport I-23  [22.74 MB]
          Download parts
          
 Rapport I-23 Erratum  [208.9 KB]
              Inhaltsverzeichnis
              | Reading Guide | |
| CHR / RheinBlick2050 Project Group | |
| Acknowledgements | |
| Foreword | |
| General Information on the International Commission for the Hydrology of the Rhine Basin (CHR) | |
| Table of Contents | |
| Summary | |
| 1 | Introduction | 
| 1.1 | State of the Art | 
| 1.2 | Study Motivation and Objectives | 
| 1.3 | Study Area | 
| 1.4 | Structure of the Report | 
| 2 | Overview of Available Data and Processing Procedures | 
| 2.1 | Overview of Datasets | 
| 2.1.1 | Discharge Reference Data | 
| 2.1.2 | Hydrometeorological Reference Data | 
| 2.1.3 | Climate Change Projections | 
| 2.2 | Atmospheric Data Processing | 
| 2.2.1 | Temporal and Spatial Aggregation | 
| 2.2.2 | Bias-Correction Methods | 
| 2.3 | Rainfall Generator | 
| 2.4 | Hydrological Models | 
| 2.4.1 | Short Overview | 
| 2.4.2 | Semi-Distributed Model HBV | 
| 2.4.3 | Lumped Models | 
| 2.4.4 | Evaporation Approaches | 
| 2.5 | Model Coupling Experiment and Analyses Design, Limitations | 
| 2.5.1 | Data Flowpath | 
| 2.5.2 | Target Measures | 
| 2.5.3 | Representation of Results | 
| 2.5.4 | Limitations of the Experiment Design | 
| 3 | Evaluation of Data and Processing Procedures | 
| 3.1 | Evaluation and Selection of Climate Model Runs | 
| 3.1.1 | Evaluation of Spatial Structures Based on Annual Means (Step 1) | 
| 3.1.2 | Evaluation of the Annual Cycle (Step 2) | 
| 3.1.3 | Outlier Identification (Step 3) | 
| 3.1.4 | Discussion and Selection (Step 4) | 
| 3.1.5 | Conclusion | 
| 3.2 | Effects of Bias-Correction and Time-Series Resampling | 
| 3.2.1 | Results of Bias-Correction | 
| 3.2.2 | Combined Results of Resampling and Bias-Correction | 
| 3.2.3 | Limitations of the Bias-Corrected Resampled Series | 
| 3.2.4 | Conclusions | 
| 3.3 | Hydrological Model Performance and Uncertainty Analysis | 
| 3.3.1 | Model Performance Evaluation over the Reference Period | 
| 3.3.2 | Quantification of Model Uncertainty | 
| 3.3.3 | Conclusions | 
| 3.4 | Comparison of HBV134-Simulations with Observed Target Statistics | 
| 3.4.1 | Validation Results | 
| 3.4.2 | Discussion of the Validation Results | 
| 3.4.3 | Conclusions | 
| 3.5 | Overall Conclusions of the validation | 
| 4 | Meteorological Changes in the Rhine River Basin | 
| 4.1 | Data and Methods | 
| 4.2 | Annual Cycles Changes | 
| 4.3 | Seasonal Changes | 
| 4.4 | Robustness of the Precipitation Change Sinals | 
| 4.5 | Conclusions | 
| 5 | Changes in Mean Flow in the Rhine River Basin | 
| 5.1 | Data and Methods | 
| 5.2 | Projected Changes for Mean Flows | 
| 5.3 | Conclusions | 
| 6 | Low Flow Changes in the Rhine River Basin | 
| 6.1 | Data and Methods | 
| 6.2 | Low Flow (NM7Q) | 
| 6.3 | Low Flow (FDC_Q90) | 
| 6.4 | Conclusions | 
| 7 | High Flow Changes in the Rhine River Basin | 
| 7.1 | Data and Methods | 
| 7.2 | Projected Changes for High Flows | 
| 7.3 | Conclusions | 
| 8 | Report Summary and Overall Conclusions | 
| 9 | Outlook | 
| References | |
| Figures | |
| Tables | |
| Nomenclatures, Definitaions, Abbreviations and Acronyms | |
| CHR Publications | |
| Appendix | |
| A | Target Measures | 
| A.1 | Questionnaire | 
| A.2 | Feedback | 
| B | Regional Climate Change Projections Data Overview | 
| C | Hydrological Model Features | 
| D | Performance of Hydrological Models | 
| D.1 | Detailed Results of Hydrological Models over the Reference Period (1961-1990) | 
| D.2 | Hydrological Model Testing | 
| E | Air Temperature and Precipitation Changes | 
| F | Extreme Value Analyses of Simulated Discharges | 
| G | Flood Statistics Provided by the German Federal States and Rijkswaterstaat | 
| Additional Material | |
| Individual Authors Contributions Overview | |
| Colophon | 
Offizielle berichte